|
TDP & Associates, Inc.
Electronics for the Model Railroader |
|
|
TrainSpeed Sensors
TrainSpeed optical sensor pair Sensor Mounting The TrainSpeed sensors require that two holes (#20 or 5/32") per sensor pair be drilled through the roadbed and sub-roadbed, a specific distance apart (see below). The sensors are then inserted in these holes from beneath the layout.
Sensor Spacing The TrainSpeed sensors can be placed 1/50, 1/100, 1/200 or 1/400 of a scale mile (or Km) apart. The spacing for most popular scales is given in this table:
|
|
Send mail to
webmaster@trainspeed.com with
questions or comments about this web site.
|